Ornamental Plaster repair work at the Boston Opera House. | Plasterer applying a scratch coat of Structolite plaster to wire lathe. Plaster repair work at the Boston Opera House. |
Repairing a fallen Plaster Chartreuse which will be made into a model for a new mold, Boston Opera House. | Some hand carving is needed in the reconstruction of a Plaster Chartreuse, Boston Opera House. | Plasterer applies Venetian Plaster as part of the instructional seminar. |
Plasterer making a Lime and Gauging Plaster mix for a Plaster finish application, Boston Opera House. | Plasterer applying a scratch coat of structolite plaster to wire lathe in preparation of plaster cornice to be run in place. |
Plasterer applying a Sponge Float Finish to a 3 coat Sand and Cement Stucco System, at the Holland School Dorchester. W.T.Rich Contractor. |
| |
Plasterer applying a Sponge Float Finish to a 3 coat Sand and Cement Stucco System, at the Holland School Dorchester. W.T.Rich Contractor. |
| | |
Plasterer applying Veneer Finish Plaster, over Basecoat Plaster and Blue Board substrate. Notice Blue Board and Blue Board butt joints taped and plastered Top right of photo notice Basecoat (Grey color) and (white color) in left corner is the finish coat being applied. | A plaster ceiling medallion is made. The desired profile is cut out of wood and high impact plastic. |
Plasterer instructor Louis Olivieri working with Plasterer Apprentices, on the Exterior Insulation Finish System (E.I.F.S.) renovation at the Local 534 Union Hall.
|
| |
Molding plaster & fiberglass reinforcement matts are applied by Local 534 member Sheldon Austin of Austin Ornamental. |
| | |
The medallion base is complete and ready for molded enrichments to be applied, or the base could be installed as is, Beautiful. |
| | |
Plasterer appling Spray Fireproofing at South Shore Hospital new addition, M.L.McDonald Sub Contractor. |
| |
Plasterers layout Aesthetic Grooves using a water level, Cape Cod Plastering Sub Contractor. |
| | |
Plasterers applying Basecoat & Reinforcing Mesh to EPS Board, G&G Plaster & EIFS Sub Contractor. |
| |
90,000 Sq Feet of E.I.F.S. at the Natick Mall, H-Carr & Son Sub Contractor. |
| | |
Burlington Mall 20,00 S.F. of E.I.F.S., N.E. Finish Systems Sub Contractor. |
| | |
E.I.F.S. at the Burlington Mall, N.E. Finish Systems sub contractor. |
Veneer Plaster at Burlington Mall New England Finish Systems Sub Contractor. |
| |
New Veneer Plaster in new class room at Tabor Academy. |
Local 534 plasterers John Langan (L) Jim Mulcahy (C) Vinny DiSalvo (R) at Tabor Academy Summit Builders Sub Contractors |
| | |
Work in progress, two coats veneer plaster at Sacred Heart Church, Weymouth. Central Ceilings Sub Contractor.
|
| |
Sacred Heart Church in Weymouth MA setting the bell tower. | The new Sacred Heart Church in Weymouth Ma, Main Ceiling Plasterers appyling Basecoat Plaster over new 1/2inch Blue Board. Central Ceilings is the Sub Contractor. |
| | |
Sacred Heart Church in Weymouth, MA Framing at the Altar Ceiling to be Boarded and Plastered. |
Sacred Heart Church Weymouth, MA |
| |
Local 534 Plasterers working at new Norwood High School cafeteria, Angelini Plastering is the sub-contractor. |
| |
Local 534 Plasterers working at new Norwood High School cafeteria, Angelini Plastering is the sub-contractor. |
Plasterer performing EIFS work at new Lowes Quincy MA. | Plasterers working at the new Lowes Quincy MA. |
| | |
EIFS Renovation at Holliday Inn South Bay Dorchester MA. Cape Cod Plastering sub contractor. |
| |
Local 534 plasterers performing EIFS work at Lowes Quincy MA. |
| |
Local 534 plasterers working at Holliday Inn South Bay Dorchester MA. |
|
|